Closer.. But Not Quite There

This week brought us a couple of steps closer to being able to occupy our new space, but didn't get us all of the way there.

We had our final fire inspection on Monday and everything looked great.  Until the fire marshal noticed that we didn't have an anti-tamper switch installed on a fixture connected to our new fire hydrant.  

Our plans called for the switch, but somehow it never showed up. Our site contractor forgot to install it.  Our General Contractor didn't notice it's absence.  Nor did any of the 4 previous inspectors who came out at various times to check our new fire alarm system.  Guess that's why multiple inspections are required.  

So our contractor spent the last few days digging up the parking lot, installing this missing piece of gear and putting things back in place.


In the meantime, the local fire house came and tested our hydrant and declared it good for use by painting the top silver.  


This means that as soon as we can get the fire marshal to sign off on the new anti-tamper switch we can move on to our final inspection for occupancy.

On another note (either positive or negative depending on how you choose to look at it), our building got its first taste of graffiti this week.


While this isn't a huge hassle since we have our painters coming back out to do final touch ups anyway- it is ironic that the building never attracted graffiti in it's old, run down condition.  To look at the bright side of things- we prayed that God would place us in an area with needs- and He has.

THIS WEEKEND
Since we don't have our C.O. yet, we'll plan on meeting one final time at Delightful Inspirations this Sunday (3/29). Please join us in praying that we'll pass our final inspections quickly and be able to use our new building next Sunday (4/5).