Thursday, January 29, 2009

Sprinklers! & Adult Gathering Space

We've got fire suppression sprinklers going in!  




While I admit that doesn't sound too exciting- and that we have no plans on ever using them- this does represent a crucial phase of our renovation process.  Especially since we won't get our Occupancy Permit without them.  

This week also saw the drywall work continue as the crews came back to tape and mud. Needless to say the space is looking MUCH different.  As our designer said, "It actually is starting to look like a building again- instead of a skeleton."  I agree.

Here are a couple of shots of our main adult gathering space. This is where our adults will come together on Sundays to connect with God and each other.  The space should hold about 250 chairs- which gives us room to grow, but should also help us maintain a personal, intimate feel.  

Here's a view looking down from the 2nd story loft.

A floor view from the back of the space.

Of course, this area will get plenty of use beyond Sunday mornings.  Our teens will use it on Fridays for the Night Life Cafe.  Different groups in CNX will have access when they need it. And since we're planning on sharing this facility with our neighbors, we envision groups outside of CNX making use of it too.  After all, God didn't bless us with this building just to keep it to ourselves!

Check back next week for a peek inside our kid's areas.

Thursday, January 22, 2009

Snow? No problem!

The snow may have closed schools and kept most of us home for a couple of days, but plenty of work got done at our future facility this week.

For starters, we've got a new bike rack.

This was required by code, but could serve us well in an area that has a lot of foot and bike traffic. So feel free to bike in on Sundays. You'll save gas $ and get some exercise!

The drywall crews were also working hard this week. As you can see below, a little drywall makes things look radically different.

The High School side of the teen space pre-drywall

Same area with drywall

The back wall of the main adult gathering space

Same wall today- reverse view

The front walls in the adult gathering space.

Front walls w/drywall (view from 2nd story loft)

Please keep praying. It's working!

Thursday, January 15, 2009

You Gotta Have It

Some parts of a building project are exciting- watching walls go up, seeing spaces defined, choosing colors, etc. Other phases are essential- but not much to look at. That's the kind of work that took place this past week as the renovations of our future space moved onward.

POWER
The electrical work continued and we passed our first electrical inspection. With the new ramps poured last week, the workers were able to bring in a lift to start working on the second story wiring.


SAFETY
We're making changes to the building to ensure that our new space is safe for everyone. To that end we're installing fire suppression sprinklers and a new fire alarm. Progress was made on both of these items this week. Here are a couple of shots of some excavation that is happening to bring water pipes into the building to feed the sprinklers.

Digging up the parking lot and sidewalk.

The old men's locker room is being re-purposed to serve as the sprinkler riser room. New exterior doors will provide access to this area.

PRAY
As of today the project is still slightly ahead of schedule. If you're willing, please join us in praying for this work and the space. Here are some things you might ask God for:
  • That we’ll stay on schedule.
  • That our workers will stay safe.
  • That we’ll have a smooth inspection process.
  • That we'll have the finances needed to finish and use the new space in ways that help people and honor God.
  • That God will prepare us for all of the new opportunities this space will give us to love and serve people.
  • That God will be preparing new folks who will get involved with our faith community after we move to this space.
Be sure to check back next week for another update

Thursday, January 8, 2009

Roof, Restrooms & Ramps

The work has rolled on this week at our future meeting space.  As of today we're slightly ahead of schedule.  Please pray that this will continue and that we'll have a relatively easy inspection process.  We're ready to get in there, begin the next phase of our life together and start getting to know our neighbors and learning how we can best love and serve them.

Here are a few of the areas of the building where we saw progress this week:

ROOF
A good portion of the roof on the building was compromised by water leaks and irreparable. Fortunately we were able to obtain a very reasonable bid for replacement and the workers are about half way done removing the old roof and installing the new one.  

Off with the old.

RESTROOMS
The bathrooms in our new space will be a bit unique.  Since the bldg used to house a health club we've actually got locker rooms (sans lockers) that have bathrooms in them.  So we've made a couple of changes to try and maximize space and minimize expenses- all the while giving everyone a place to potty.  In the men's room for example we've closed the original entrance and created a new one by removing one of the showers.  Why?  it allowed us to double the space in our infant nursery.  But more on that later. 

The new way in to the men's room.

A shower becomes an entrance.

RAMPS
A healthy portion of the cost to renovate the building goes toward updating it up to meet current codes.  This week two concrete handicap accessible ramps were formed and poured to allow our friends in wheelchairs (and the rest of us) to be able to enter and exit the building in multiple ways.  These new ramps both lead to doors in the back corners of the building.  So if you don't get a parking place up front, don't sweat it.  A door will be close by.

The back left corner of the building.  Steps lead into the main adult area.

One turn at the bottom of this ramp will put you in the middle of the main adult area.

Thanks again for your interest in this project.  Please keep praying for it/us and checking back for status updates.  And if you want to come hang out with our community before we move to the new space we're meeting on Sundays @ 10:45 HERE.